What We Do

Services

Here's the full list, with the detail that actually matters for each one.

Home › Services

Everything we take on

Every job below is one we do ourselves across Las Cruces.

Deck Installation

We frame new decks with pressure-treated joists set on footings poured below frost depth, which around here means getting through the caliche layer, not just the topsoil. Ledger boards get flashed and bolted to the rim joist, not just nailed on. We'll walk you through spacing, stairs, and railing before the first post goes in.

Custom Deck Design

If you've got an odd lot, a slope, or a spot where the yard drains straight toward the house, we design around it instead of fighting it. We sketch the layout, pick the board pattern and railing style with you, and give you a price before any lumber gets ordered.

Deck Repair

Soft or spongy boards, a bounce in the frame, rails that wiggle, loose stair stringers, we fix all of it. Sometimes it's a couple of joists that rotted out at the ledger. Other times the whole frame has to come up because the footings shifted.

Deck Staining & Sealing

New Mexico sun is hard on wood, UV breaks down the finish fast and the boards gray and check if they go too long bare. We pressure wash, let the deck dry fully, then stain and seal with a product rated for high UV exposure. Most decks here get a fresh coat every one to two years, not the five you'd get in a wetter climate.

Composite Decking Installation

Composite boards don't splinter, skip staining entirely, and hold up better to the kind of sun we get. The frame still gets built the same way, with proper joist spacing and hidden fastener clips so the surface stays flat and tight.

Deck Railing Installation

We set posts, balusters, and top rails to current code spacing, meaning a 4-inch sphere shouldn't pass through anywhere in the rail. Wood, cable, or metal rail systems, we'll tell you honestly which one holds up best outdoors here.

Deck Board Replacement

If most of the frame is solid but the decking itself is cupped, splitting, or just worn out, we pull the old boards and replace them without rebuilding the whole structure. It's a faster, cheaper fix than a full rebuild when the frame underneath checks out.

Deck Resurfacing

New decking, wood or composite, can go right over a sound existing frame, which changes the whole look of a tired deck in a day or two. We check the joists for rot first, because resurfacing over a bad frame just hides the problem.

Covered Deck & Patio Cover Construction

A lot of decks out here require some shade to actually get used in July. We build pergolas and covered structures tied into the deck frame, sized for the load and anchored so monsoon wind doesn't take them with it.

Deck Demolition & Rebuild

Sometimes a deck is past saving, a rotted ledger, failed footings, framing that was undersized from the start. We tear it out, haul off the old lumber, and rebuild from the footings up instead of patching something that'll just fail again.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Las Cruces, NM

Deck work covers Las Cruces and the towns within about fifty miles.

Las Cruces, NM
El Paso, NM
Sunland Park, NM
Chaparral, NM
Anthony, NM
Vado, NM
Mesilla, NM
Doña Ana, NM
Hatch, NM
Organ, NM
Common Questions

Things worth asking

Questions that come up once a deck project actually gets underway.

Is a permit needed for a new deck?
Most elevated decks and any deck structurally attached to the house require a permit in Doña Ana County, though small, low, freestanding platforms sometimes don't. Permit filing and inspection scheduling are typically included in a deck installation project.
How long does building a deck take?
A straightforward ground-level deck usually takes three to five days from footings to finished decking. A raised deck with stairs, railing, and a required permit inspection can take two to three weeks including the inspection wait.
Can a deck be built to a specific budget?
Lumber species, railing style, and overall size are the main factors that adjust total cost, and pressure-treated pine costs significantly less than composite or cedar decking. Design changes can bring a project in line with a target budget before materials are ordered.
Is deck work guaranteed?
Workmanship on deck construction and repair is covered by a guarantee, separate from manufacturer warranties on composite decking or hardware. Warranty terms are listed on the written estimate for each job.
Who handles questions once a deck project starts?
The same crew that frames the deck also completes the finish work, so questions go directly to the people on site. There's no separate office contact handling day-to-day project details.
What decking material works best in this climate?
Pressure-treated pine costs the least upfront but requires re-staining every one to two years under constant desert UV exposure. Composite decking costs more initially, skips staining entirely, and holds its color longer in high sun.
Can the yard still be used during deck construction?
Most of the yard stays accessible during deck construction, though the immediate work area near footings and framing has to stay clear for safety. Doors near the ledger board attachment point may be blocked off for a day or two.
What should be done to prepare the site before work starts?
Clearing furniture, grills, and planters off an existing deck or build area is the main preparation step, along with flagging any known sprinkler lines or buried utilities. Excavation and dirt work for footings is handled on site.
What if rot or damage is found once the old deck comes up?
Hidden rot in ledger boards or rim joists is a common find once old decking is removed, and it gets priced as a change order before any extra work begins. This is flagged as a conversation first, not a surprise added to the final invoice.
How should a finished deck be maintained?
Wood decking requires re-staining roughly every one to two years in a high-UV climate to prevent cracking and graying. Composite decking requires only occasional washing to clear dust and pollen, with no sealing required.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (575) 448-9644